Resume Writer - Need One ?
The Following Text Is An Unformatted Professional Resume Sample
From The Writers At Resumes Guaranteed
ORDER YOUR OWN LETTER-PERFECT, JOB-WINNING RESUME AND IT WILL BE COMPLETED AS SOON AS YOU NEED!
Click HERE!
Toby Riddle
|
0000 xxxxxx xxxx , xxxx , xxxxx 00000 |
|||
Executive Profile
|
Rig Manager / Veteran Driller Veteran driller with over 30 years experience seeking new application for multi-faceted and transferrable skill set within the oil industry. |
|||
Key Qualifications |
Project Management Tool Pusher Oil Base Mud Mineral Base Mud |
Horizontal Drilling Water Base Expertise Down Hole Drilling Drill Consultant |
Air Drilling High Pressure Mud Cap Drilling Drilling Superintendent
|
|
|
|
|||
Career Path
|
Pen Virginia Oil and Gas LP 2007-2009
Drilling Consultant Drilled bossier and Haynesville vertical and horizontal wells to depths in excess of 15,000 feet. Oversight of horizontal drilling projects utilizing oil base mud as well as Synvert mineral base mud.
Grey Wolf Drilling 2001-2007
Rig Manager
Bayard Drilling C Nabors Drilling 1997-2001
Driller Responsible for the drilling of deep KOP (14,000-21,000 ft.) horizontal gas wells. Responsible for drilling of lateral areas between 4,000 C 6,000 ft. Program included dual opposing and dual quad lateral wells with high pressure (5,000 C 10,000 PSI) high volume gas. Mud weights ranged from 14 PPG to 19 PPG.
T&W Welding 1992-1997
Owner/Operator Installed well heads for UPR inc. and PSN petroleum. Performed general rig welding. Projects included tank manufacturing and various repair assignments for numerous clients.
PSN Drilling 1987-1992
Driller Responsible for the drilling of numerous wells ranging between 6,000 C 10,000 ft. in depth. Mud weights ranged 10.0 PPG C 12.0 PPG. Utilized water based mud in drilling of vertical and horizontal wells. Utilized Bullhead method of killing wells.
Tom Brown Drilling Inc./TMBR Sharp Drilling 1980-1985
Driller Responsible for drilling of vertical wells. Utilized air misting and air dusting for wells drilled from 7,000 C 8,000 ft.
Cinco Drilling 1975-1978
Floor Hand Motorman and Derricks Drilled Austin chalk wells ranging from 8,000 C 10,000 ft. Mud weights ranged from 9.7 C 12.0 PPG.
|
|||
education & Specialized Training |
Sam Houston State University Well Control (Currently Enrolled) Randy Smith Leadership Training Tom Brown Supervisory Training Tom Brown Leadership Training Can-Rig Top Drive Training Forklift Training Manlift Training First Aid and CPR Training
*References Available Upon Request* |
|||
<< Previous Back to Sitemap Next >>
Remember: Hire Us To Write YOUR New Resume
And We GUARANTEE That If You’re Not Working In 60 Days Or Less,
We’ll Revise Your Resume, Refund Your Money,
AND Give You $50 EXTRA!