Resume Writer - Need One ?
The Following Text Is An Unformatted Professional Resume Sample
From The Writers At Resumes Guaranteed


ORDER YOUR OWN LETTER-PERFECT, JOB-WINNING RESUME AND IT WILL BE COMPLETED AS SOON AS YOU NEED!
Click HERE!



 

Toby Riddle

 

0000 xxxxxx xxxx , xxxx , xxxxx 00000
abc@xyz.com

 

 

Executive Profile

 

 

 Rig Manager / Veteran Driller

Veteran driller with over 30 years experience seeking new application for multi-faceted and transferrable skill set within the oil industry.

Key Qualifications

  Project Management

  Tool Pusher

  Oil Base Mud

  Mineral Base Mud

  Horizontal Drilling

  Water Base Expertise

  Down Hole Drilling

  Drill Consultant

  Air Drilling

  High Pressure Mud Cap Drilling

  Drilling Superintendent

 

 

 

 

Career

Path

 

 

Pen Virginia Oil and Gas LP                                                         2007-2009

 

Drilling Consultant

  Drilled bossier and Haynesville vertical and horizontal wells to depths in excess of 15,000 feet.

  Oversight of horizontal drilling projects utilizing oil base mud as well as Synvert mineral base mud.

 

 

Grey Wolf Drilling                                                                             2001-2007

 

Rig Manager

  • Responsibilities included turnkey, footage, and daily work oversight.
  • Supervised work on vertical and directional wells.
  • Utilized oil mud base from 12.5 PPG to 18.0 PPG.
  • Executed drilling projects involving expandable drilling liners, setting whipstocks, and balanced wells.
  • Worked in depths between 12,000 to 19,800 MD.
  • Worked in areas of high pressure and volumes of gas.

 

Bayard Drilling C Nabors Drilling                                                 1997-2001

 

Driller

  Responsible for the drilling of deep KOP (14,000-21,000 ft.) horizontal gas wells.

  Responsible for drilling of lateral areas between 4,000 C 6,000 ft.

  Program included dual opposing and dual quad lateral wells with high pressure (5,000 C 10,000 PSI) high volume gas.

  Mud weights ranged from 14 PPG to 19 PPG.

 

T&W Welding                                                                                      1992-1997

 

Owner/Operator

  Installed well heads for UPR inc. and PSN petroleum.

  Performed general rig welding.

  Projects included tank manufacturing and various repair assignments for numerous clients.

 

 

PSN Drilling                                                                                1987-1992

 

Driller

  Responsible for the drilling of numerous wells ranging between 6,000 C 10,000 ft. in depth. 

  Mud weights ranged 10.0 PPG C 12.0 PPG.

  Utilized water based mud in drilling of vertical and horizontal wells.

  Utilized Bullhead method of killing wells.

 

 

 

Tom Brown Drilling Inc./TMBR Sharp Drilling                          1980-1985

 

Driller

  Responsible for drilling of vertical wells.

  Utilized air misting and air dusting for wells drilled from 7,000 C 8,000 ft.

 

Cinco Drilling                                                                                         1975-1978

 

Floor Hand Motorman and Derricks

  Drilled Austin chalk wells ranging from 8,000 C 10,000 ft.

  Mud weights ranged from 9.7 C 12.0 PPG.

 

 



education  & Specialized Training

  Sam Houston State University

  Well Control (Currently Enrolled)

  Randy Smith Leadership Training

  Tom Brown Supervisory Training

  Tom Brown Leadership Training

  Can-Rig Top Drive Training

  Forklift Training

  Manlift Training

  First Aid and CPR Training

 

*References Available Upon Request*

 

<< Previous           Back to Sitemap           Next >>

Remember: Hire Us To Write YOUR New Resume
And We GUARANTEE That If You’re Not Working In 60 Days Or Less,
We’ll Revise Your Resume, Refund Your Money,
AND Give You $50 EXTRA!

Click HERE!